Dar-Elsalam district building
Dar-Elsalam district building

The Need:

Grid-tie: its apart of Egyptian government plan to improve the national grid
with alternative and green power sources.
Emergency and backup: ministry building is very important and critical load
and depending on diesel  generators as backup isn’t very reliable compared to
solar power.

Solution :

1- based on load profile of 20KW emergency system was installed which consists
of :
component configuration
Solar PV 20 KW (luxor)
Solar chargers 20 KW (STUDER ) (4Xvariotrack)
inverter 21 KW (STUDER ) (3X xtender XTH-8000)
Battery 72 cells (2V 8RES OPzV 1245 AH)
2-based on load profile of 10 KW emergency system was installed which consists
of :
component configuration
Solar PV 10 KW (luxor)
Solar chargers 10 KW (STUDER) (2Xvariostring)
inverter 21 KW(STUDER)(3X xtender XTH-8000)
Battery 72 cells (2V 8RES OPzV 1245 AH)
3-Grid-tie system of  95 KW:
component configuration
Solar PV 95 KW (luxor)
inverter 99 KW (Advanced energy)(3x20KW,3x13KW) .


OVERVIEW

Pv solar power plant 125 Kw Roof mounted. project consists of : 1-95 kw pv panel connected to grid-tie inverter 2-30 kW pv panel connected to backup and emergency system for governorate ministry building.


THE RESULT

125 Kw solar power plant feed the governorate building and give backup system for important and critical Loads . Project status : finished and working .