The Need:

 

its a part of Egyptian Government plan to improve distant roads and supply them with electric power.

 

Solution :

1- Based on load profile of  25 KW emergency system was installed which consists of:

component  configuration
Solar PV : 52 KW (solar fabrik)
Solar chargers: 4 KW (STUDER) (16 Xvariotrack)
Inverter: 5 KW(STUDER)( 6 X xtender XTH-6000)
Battery: 96 cells (2V 18 RES OPzS 3780 AH)


OVERVIEW

off –Grid solar project to supply 200 LED luminaire with electricity for 12 hours . Pv solar power plant 25 Kw Free Field . project consists of : 52 kw pv panel connected to off Grid system. Project status : finished and working .


THE RESULT

25 Kw solar power plant feeds 200 Led Luminaire with electricity for 12 Hours / daily .